Sunday, August 28, 2016

More trim, a tree, and a few rocks

The two hand hewn beams and fireplace mantles were installed! 
Here is the other hand hewn beam along with an accent wall in the master bedroom. 
Exterior stair handrails got completed. 
This is the beginning of the stone front steps and post bases going to the front door. 
The downstairs doors were also installed. 
Here's Faithie planting a crape myrtle that Memaw gave us. It was placed so that people wouldn't think they should drive this way when coming up the driveway, but with still enough room you can get by once the grass is established. 
The downstairs fireplace hand hewn mantle with corbels and the beginning of stone that will wrap both sides and go to the ceiling! We did a combination of small and medium sized stones. The guy was very grateful when I asked him if he would like for me to move the two large pallets of stone from the front of the house to the back with the skid steer!