Saturday, June 25, 2016

So.... More stuff happened, like siding


 Not a bad way to end a Monday bush hogging!
 Heat N'Glo Cerona direct vent fireplace for the main level.
 Well, I planned for the larger width and height of the Icon 80 wood burning terrace fireplace, but not depth! It needs to be 2" deeper... Oh well, framing punch will get it done this week.

 I believe I am going to have a light installed above this so that light shines through it at night. You really can't tell that much from the outside during the day....
 Composite wrapped deck posts. The lower posts won't be wrapped until after we get the CO (Certificate of Occupancy). Long story short, Code won't allow it for now....
 Panoramic between the house and barn.
 I liked this picture enough to make it my cover photo on FB!
 Behind the barn where we "robbed" dirt from.
 I should have taken this picture from just inside the barn, like the last post, but it's close enough. Now it is level in between the house and the barn!!!
 AND, the roof shingles finally got finished! Siding is installed on three sides at this point.
The driveway will become circular in front of the house. Where I parked is about where guests will park and be the turn around area for backing out of the garage. The original driveway where the dumpster currently is located will be abandoned and we will sow grass. Almost all of this, including removing the wood shop, is so that how you pull up and parking in front of the house is better than originally planned.

Monday, June 20, 2016

Delayed updates

Blogger didn't post this blog when I hit publish on my phone...... So I am going to try and remember what I wrote and try this again... The felt, ice and water shield are on the roof. The white part is the ice and water, it protects the roof better where water is prone to leak.

More of the same!

 You can see the red and blue Pex water lines already installed. This photo was taken the first day of HVAC mechanical rough in Haley's room.

 
Yea, the front door is installed! The siding guys started today and will install the stained glass.
  Shingles installed on the front!
 
Unfortunately, this building had to go.... :( It's a few feet too low, for grade in between the house and the barn. And, the driveway will end up going directly through the building so it was time to take it down. It took most of the day Saturday, but a helper and I got it disassembled and were able to salvage the majority of the wood and tin! Most of the wood will be used on rebuilding the shed part of the barn for Bunky's stall, tractor storage and Airstream bay. The door will go in between the tack room and stall and we will try and recreate the end gable elevation to match this elevation of the wood shop.

Here it is after a day's worth of work!

 And here it is after another day which my helper did by himself. I was fortunate enough to take the day off for Father's Day and spend it on the lake!


Sunday, June 5, 2016

It's starting to look like a house!

Not much to report really. But as you can see, trusses were set on Tuesday after Memorial Day and the final picture was taken on Friday. Progress! 

Sunday, May 29, 2016

Framing progress

Yep, walls on the main floor were stood up in one day. 
Main living room
Rear of home
Haley and Faith giving dear life long friends Joan and Dan Crooks a tour of the house! 
The solid pressure treated beam seen in the floor allows the porch to span 18' without posts below. We also used Camo brand screws so there aren't any nails showing in the deck boards. 
More dear friends Mark & Stephanie Brunner came by and we all got to see this rainbow, we just forgot to take a picture of us together! 

Sunday, May 22, 2016

Framing commences, so I may get nutty with pictures!

Better late than never, but my concrete subcontractor sent this to me two weeks after requested! 
He told me that he was going to add the Spanish Lace color to the concrete, but he didn't tell me he was going to also stamp it with a slate texture! Thank you Baumgarten Cement!!! 
Day 1 of framing complete
Day 1
Day 2 and they removed the shed portion of the barn
Day 2 they also removed the shed portion from the wood shop! 
Day 3 was inspected with my dad the following day. Faith, friends and I saw Willie Nelson the night before at Chastain, so I didn't make it out there the third day of framing! 
My worker-girl helping me out! She's a good hep-mate!

Saturday, May 14, 2016

Concrete complete and backfill grading too



 
My project last weekend. Rented this magnetic drill to be able to drill holes on the bottom of the beams. This will allow for attaching wood framing to the ceiling and then sheetrock later.
 
Beams in place
 
She humors me, and I'm grateful for it! This will be the Beaner/Hoop dawg/Houihan/Baby girl/Haley's room!
 
Faith waving hello on top of our poured garage slab! 
 
The upper left portion of concrete looks different because it has a colored powder added to the concrete mixture throughly, and then they throw it on once finished to add just a touch more color. Monday they will come back and clean it off and then seal it! This was a "house warming" gift from my concrete contractor. It's going to look great and we are grateful!
 
Time lapse photo.
 
The old homesite with final coverup and dirt added and sloped away from the old retaining wall close to the top of the photo.
 
The bank on the right has some slope to it, but dirt was taken from here to help drainage around the barn and to use as backfill around the house. The circular drive is starting to take shape and the island will be dressed up with more trees and flowers over time.

Thursday, May 5, 2016

Finished plans and foundation slab

This week we finished the foundation slab. Next week we will have the I-beams set, then metal pan and pour concrete on top of it for the garage.

 Here is a picture of the front and right side elevation which you will drive up to and see.
This is the rear and left side.
Together forever! 
Boring concrete, but you have to have it!