Finished plans and foundation slab

This week we finished the foundation slab. Next week we will have the I-beams set, then metal pan and pour concrete on top of it for the garage.

 Here is a picture of the front and right side elevation which you will drive up to and see.
This is the rear and left side.
Together forever! 
Boring concrete, but you have to have it! 

Wednesday, May 4, 2016

Nothing is ever prefect, but we try

With as long as I've been doing this, and this being my own home, you'd HOPE that it went off without a hitch. But Murphy's Law says something about that and when my plumber notified me a footer was in the wrong place I new exactly what happened.... When you are still designing your home WHILE you build, stuff like this is bound to happen. My concrete guy went off the original plan that had a jog in the foundation, instead of the plan that extended the jog, basically. But no big deal, cut out some concrete, put in the plumbing pipes, then come back and reform when they pour the slab which is today. May the 4th be with you! And if this is the biggest error to occur, then it's definitely no big deal, but I doubt we'll be that lucky so we'll roll with the punches. Right honey?!?

 The area in bathroom #2 with the jog error and footer torn out.

 The same area with the footer reformed!
 How cool is this? I love the DJI Phantom 3 Pro!
 It's hard to tell that we've cleaned up where the former house resided, but it has and there's still more to do.
 I'm hoping I can have a time lapse of the project with this similar view to show off the transformation.
Another cool angle with the house and old home site. The out building seen here will be moved to the middle of the circle drive close to the house.

Monday, April 25, 2016

Walls

The two openings at the top of the wall are for mechanicals to go through. And of course a doorway that is part of the hallway. 
The plumber came and created some relief drains to get the rainwater out. Otherwise it would have been wet still on Monday. 
The Platinum Prince will be parking on top of this wall one day soon! 
This is an old cast iron tub that was in the original house. We hope to make it the water trough for Bunky. Fortunately, my plumber let me use his equipment and I was able to work on the old foundation as well, getting rid of it. 

Not much is going on this week. The slab should be poured in a week and then the steel I-beams will be installed for the garage slab. 

Monday, April 18, 2016

Footers and final clearing

 Formed footers


 Lots of rebar! Read below why these footers were bigger and had more steel in them.
 Poured footers!

  Notice the difference in width of these footers compared to the others? That is for the 12" wide by 10' tall garage walls that will have steel I-beams and a metal pan with concrete on top for the garage. We will have a hallway, part of Haley's room and the unfinished mechanical room under here. Based on our floor design, it was the only way we could get two bedrooms on the terrace level where we wanted them to be and have the other family room in the right place too. No, we are not "preppers" and building a bunker to protect us. But if a tornado comes through here, that's where we'll be!
This is all of the stone from the original fireplace that fell into the old house when it burned. These will also be re-purposed on the property. We haven't decided if we will leave the fallen chimney or tear it down and rebuild with the pavilion that will be built on this part of the property.
 Faith in the old root cellar, throwing out bricks that we will re-purpose somewhere on the property.
 THANK YOU to my dad for the use of his equipment, I couldn't have done it without the skid steer and it's attachments!!!! This was the last of the major cleanup and getting rid of dead or trees I wanted removed. I was thinking about how they would have used horses and donkeys on this property so many years ago and what that must have been like. I feel blessed to grow up in the era of heavy equipment and the many modern marvels we have, even the chainsaw! What will they think of in the next 100 years???
I probably should have taken a photo each week here in the beginning so I could have a "time lapse" of the progress. Oh well, it sure does look different than the last drone photo from here!

Sunday, April 10, 2016

Initial grading complete and foundation started

Day 1 of grading and burning the large pile of brush I put up. 
Day 1, septic system is going where the light color dirt is. 
Initial grading complete! Maddie is enjoying herself too! 
Initial grading complete. 
My new brothers in Christ, Hank Sutton on the excavator and John just out of sight. Both were saved on a job site. The first time I met Hank I didn't care for him. He has come a long way and I'm happy for he and John.
We are so glad that Uncle Bob and Aunt Lynne were in town from New Hampshire to see the very early stages of construction. Bob confirmed a couple of ideas I already had on the house design, so we implemented them. 

Sunday, March 27, 2016

Progress, cleanup and bumpers

 With brand new tracks Jason and I put on yesterday, I'm loaded up and heading to the property.
 My bright idea was to take this top layer of dirt and grass and load it into the back of the dump trailer. What I didn't take into account was that I was loading the very back of the trailer and not distributing the load throughout. What you see here are the skid marks where my truck went "ball hootin'" down the driveway once the load was great enough and unloaded weight from the rear wheels of my truck.
 In the road is where the truck stopped, but the trailer pushed the back end around until it jack knifed. LUCKILY, no one was driving by at this time, or worse, walking. And, both truck and trailer didn't end up in the golf course, cause that would have been expensive!
 The only damage to my truck was the bumper, no body work.
 But the trailer's box that holds the battery didn't fare as well.....
 The pile of brush on the other side of the well is everything I cut down last weekend.
 Getting cleaner! This building will hopefully be moved to another location since it is a good structure. Where it will be placed is another topic and we won't know until the hole for the basement is dug this week.
I left the last few trees for my grading contractor to remove since he has bigger equipment. I removed the two small structures that were on the right of the picture. I was able to salvage some of the good tin that was on it, but it had a layer of really cheap tin with scalloped decorations underneath that will go to the dump.

Grading should start this week!

Monday, March 21, 2016

Am I doing this right?

When you're running a chain saw for a few hours on end you start to think about things..... I couldn't remember if I was doing this right so I sent a text out to my family members and asked them. Amy said "Stupid is as stupid does", but my mom had the best response of "Redneck vasectomy"!
I'm glad to say I can still have kids, but that doesn't change our decision.